Project description
Floor installation in a newly built two-storey maisonette in Aigio.
It has been installed on all the floors of the house, apart from the floors of the bathrooms and the kitchenpolished wooden floorOak.
The floorit has been glued with special adhesives to the substrate because the house has an underfloor heating system. The floor was installed in 2008.
The steps, railings and wooden elements of the staircase are made of solid dry oak timber. Wood and floor varnishes have been used on the woodBONDEX. In the wardrobes, melamine boxes have been usedAKRITASand on the doors and sides it has been usedMDFveneered OAK varnished.
The interior walls and ceilings have been painted with plastic paintECO STATUSand the outer walls withSTATUS 100% acryliccolour. All products were supplied by our company.
You can see the results in the photos of the project.